Schematic of Sensors on Bridge
Following a suggestion by Dan regarding doing a schematic for the position of the sensors around the bridge.
I have prepared the following. (image 1)
The wind meter sensor and the rain gauge transmitter has a range of approx. 60 ft.
This should allow the receiver to be in the activisation lab on level 4 with the sensors in the open.
Final positioning will occur with the approval of Anthony, Jason and Dan.
Advertisements
No comments yet
Jump to comment form | comment rss [?] | trackback uri [?]